Wholesale and Distribution Terms That Decide Your Margin

Wholesale and Distribution Terms That Decide Your Margin

Summary

Three clauses decide whether a distributor margin survives year one: how the price break is built, how a mixed pallet is packed, and when the balance falls due.

Wholesale terms are not a discount schedule. Three clauses decide whether your gross margin survives the first year: how the price break is built, how a mixed pallet is packed, and when the balance is due. Get those wrong and a 40% label margin still ends up as cash you cannot spend.

Price breaks follow the line, not the relationship

A price break exists because something fixed got diluted — not because you asked. On a coated patch the fixed block is plates, die, changeover and release testing; the variable block is film, adhesive, liner and labour. A break that arrives before the fixed block is paid off is a discount someone else is funding.

So when a volume price is offered, ask which line moves. If it is film, the break is real and repeatable. If it is a one-off concession on setup, it will not survive the reorder — and the reorder is where a distributor's margin is actually made.

Coating line operator setting the working width at the control panel
Working width runs 60–120 cm on eight lines. Line time, not unit count, is what a volume commitment actually buys.

The clause that quietly eats freight: mixed pallets

Most distributor ranges are four to eight SKUs, and the first order is usually one pallet of each. That is fine on paper and expensive in practice, because chargeable weight follows volume, not mass — a mixed pallet of light cartons is priced on the space it occupies.

Packing decision
What it changes downstream
When it hurts
One SKU per pallet
Cleanest customs line and fastest receiving
When an SKU is below a full pallet and you pay for air
Mixed pallet, one PO
Lower freight per unit, more carton marks to declare
When the consignee cannot split by SKU on arrival
Mixed carton
Lowest volume, but every unit needs its own labelling
When retail requires a sellable unit with a scannable barcode
Shipper carton marked per destination
Supports 3PL and FBA receiving without rework
When the same carton has to serve two customers

Our minimum is 1,000 units per size and pack format, and it does not change with the number of colours — so a mixed first order is a packing question, not an MOQ question. Decide the pallet logic before the quote, not after the goods are packed.

Deposit, balance and the point where credit appears

A first order runs on 30% deposit by T/T with the balance against a copy of the bill of lading, FOB. Those two milestones sit exactly where money and goods change hands, which is why they are the default rather than a negotiating starting point.

Order stage
Standard term
What unlocks a change
First order
30% deposit, 70% against B/L copy
Nothing — this is the baseline
Second to fourth orders
Deposit step-down at the supplier's discretion
Two clean settlements on time, no quality claims
Repeat programme
Open credit or LC at sight
Twelve months of history, audited accounts, agreed ceiling
Peak season
Deposit may be raised, not lowered
Line time is committed ahead; cash follows the commitment

Two things are not negotiable in either direction: we do not ship without a deposit on a first order, and we do not accept full payment upfront as a way to jump the queue. The second protects you — a supplier holding 100% of your money has no operational reason to prioritise your run.

Territory, price protection and what a distributor actually buys

Exclusivity is a purchase, not a courtesy. What we will discuss: a named territory, a term, and an annual volume commitment that justifies turning other buyers away. What we will not do: publish a price list, or promise a resale price — in most markets that strays into resale price maintenance.

Price protection is a separate question from exclusivity, and it is usually the one distributors forget to ask about. Ask what happens if the film cost falls after your order is confirmed: does the next order carry the new price, and is there any retroactive adjustment on stock you already hold? A supplier who has never been asked will answer honestly; one who has will have a policy.

What to send for a wholesale quote that survives your finance team

Range map. Every SKU with size, thickness, pack count and pack format. This fixes the die count and the packing logic in one pass.

Pallet plan. Which SKUs ship together, and whether the consignee can split on arrival.

Annual figure and first run. Two numbers, not one. We quote both, and the gap tells you whether to negotiate price or capacity.

Incoterm and currency. FOB, CIF or DDP, and USD, EUR or HKD. Both belong on the same document as the price.

Six clauses to read before you sign a distribution agreement

  1. Is the price break tied to film or to a one-off setup concession?
  2. What is the minimum per SKU, and does it multiply across colours?
  3. Who pays for carton relabelling if the destination changes?
  4. Does the deposit percentage change in peak season?
  5. Is territory exclusive by revenue, by volume, or by nothing at all?
  6. What happens to your die if you stop ordering for a year?

Henso Biotech manufactures hydrocolloid, microdart and printed acne patches in Hangzhou — ISO 13485 (cert. 69136), FDA facility registration FEI 3012706495, eight coating lines with working widths from 60 cm to 120 cm, supplying 29+ countries. 2025 shipments: over 27 million boxes, 216 million sheets, 25.92 billion dots. Minimum order is 1,000 units per size and pack format. This article describes term structure, not a price list.